资源类型

期刊论文 507

会议视频 13

年份

2024 2

2023 48

2022 63

2021 41

2020 28

2019 29

2018 32

2017 25

2016 30

2015 28

2014 28

2013 21

2012 19

2011 16

2010 29

2009 6

2008 13

2007 19

2006 7

2005 7

展开 ︾

关键词

风险分析 9

风险管理 7

风险评估 5

能源 4

风险 3

风险控制 3

优化设计 2

农业科学 2

医学 2

南京长江隧道 2

危险性分析 2

大跨度桥梁 2

安全系数 2

安全风险 2

环境 2

风险决策 2

1)模型 1

2020全球工程前沿 1

2型糖尿病 1

展开 ︾

检索范围:

排序: 展示方式:

Application of probabilistic risk assessment at a coking plant site contaminated by Polycyclic Aromatic

XIA Tianxiang,JIANG Lin,JIA Xiaoyang,ZHONG Maosheng,LIANG Jing

《环境科学与工程前沿(英文)》 2014年 第8卷 第3期   页码 441-450 doi: 10.1007/s11783-013-0572-6

摘要: Application of Probabilistic Risk Assessment (PRA) and Deterministic Risk Assessment (DRA) at a coking plant site was compared. By DRA, Hazard Quotient (HQ) following exposure to Naphthalene (Nap) and Incremental Life Cancer Risk (ILCR) following exposure to Benzo(a)pyrene (Bap) were 1.87 and 2.12 × 10 . PRA revealed valuable information regarding the possible distribution of risk, and risk estimates of DRA located at the 99.59th and 99.76th percentiles in the risk outputs of PRA, which indicated that DRA overestimated the risk. Cleanup levels corresponding acceptable HQ level of 1 and ILCR level of 10 were also calculated for both DRA and PRA. Nap and Bap cleanup levels were 192.85 and 0.14 mg·kg by DRA, which would result in only 0.25% and 0.06% of the exposed population to have a risk higher than the acceptable risk, according to the outputs of PRA. The application of PRA on cleanup levels derivation would lift the cleanup levels 1.9 times for Nap and 2.4 times for Bap than which derived by DRA. For this coking plant site, the remediation scale and cost will be reduced in a large portion once the method of PRA is used. Sensitivity analysis was done by calculating the contribution to variance for each exposure parameter and it was found that contaminant concentration in the soil ( ), exposure duration ( ), total hours spent outdoor per day ( ), soil ingestion rate ( ), the air breathing rate ( ) and bodyweight ( ) were the most important parameters for risk and cleanup levels calculations.

关键词: Probabilistic Risk Assessment (PRA)     a coking plant     risk     cleanup level     sensitivity analysis     polycyclic aromatic hydrocarbons (PAHs)    

Risk-based probabilistic thermal-stress analysis of concrete arch dams

Narjes SOLTANI, Mohammad ALEMBAGHERI, Mohammad Houshmand KHANEGHAHI

《结构与土木工程前沿(英文)》 2019年 第13卷 第5期   页码 1007-1019 doi: 10.1007/s11709-019-0521-y

摘要: The probabilistic risk of arch dam failure under thermal loading is studied. The incorporated uncertainties, which are defined as random variables, are associated with the most affecting structural (material) properties of concrete and thermal loading conditions. Karaj arch dam is selected as case study. The dam is numerically modeled along with its foundation in three-dimensional space; the temperature and thermal stress distribution is investigated during the operating phase. The deterministic thermal finite element analysis of the dam is combined with the structural reliability methods in order to obtain thermal response predictions, and estimate the probability of failure in the risk analysis context. The tensile overstressing failure mode is considered for the reliability analysis. The thermal loading includes ambient air and reservoir temperature variations. The effect of solar radiation is considered by an increase in the ambient temperatures. Three reliability methods are employed: the first-order second-moment method, the first-order reliability method, and the Monte-Carlo simulation with Latin Hypercube sampling. The estimated failure probabilities are discussed and the sensitivity of random variables is investigated. Although most of the studies in this line of research are used only for academic purposes, the results of this investigation can be used for both academic and engineering purposes.

关键词: arch dams     probabilistic analysis     thermal stress     sensitivity     reliability    

Proposal of a probabilistic assessment of structural collapse concomitantly subject to earthquake and

Gholamreza ABDOLLAHZADEH, Hadi FAGHIHMALEKI

《结构与土木工程前沿(英文)》 2018年 第12卷 第3期   页码 425-437 doi: 10.1007/s11709-017-0427-5

摘要:

In recent decades, many public buildings, located in seismic-prone residential areas, had to grapple with abnormal loads against which the structures were unguarded. In this piece of research, an ordinary three dimensional reinforced concrete building is selected as case study. The building is located in an earthquake-prone region; however, it is designed according to seismic building codes. Yet, it is not shielded against abnormal loads, such as blasts. It is assumed that the building suffers a blast load, due to mechanical/thermal installation failure during or after intense seismic oscillations. These two critical incidents are regarded codependent and compatible. So the researchers developed scenarios and tried to assess different probabilities for each scenario and carried out an analysis to ensure if progressive collapse had set in or not. In the first step, two analysis models were used for each scenario; a non-linear dynamic time history analysis and a blast local dynamic analysis. In the second step, having the structural destructions of the first step in view, a pushdown analysis was carried out to determine the severity of progressive collapse and assess building robustness. Finally, the annual probability of structural collapse under simultaneous earthquake and blast loads was estimated and offered.

关键词: gas blast     pushdown analysis     progressive collapse     annual probability of structural collapse     3D model of structure    

Fate and risk assessment of emerging contaminants in reclaimed water production processes

《环境科学与工程前沿(英文)》 2021年 第15卷 第5期 doi: 10.1007/s11783-021-1392-8

摘要:

• PPCPs had the highest removal efficiency in A2O combined with MBR process (86.8%).

关键词: Trace organic pollution     Antibiotic resistance genes     Reclaimed wastewater     Sludge     Risk assessment     Mass load    

Human health ambient water quality criteria for 13 heavy metals and health risk assessment in Taihu Lake

《环境科学与工程前沿(英文)》 2022年 第16卷 第4期 doi: 10.1007/s11783-021-1475-6

摘要:

• The concentrations of 13 heavy metals in Taihu Lake were analyzed.

关键词: Heavy metals     Human health ambient water quality criteria     Taihu Lake     Health risk assessment     Contribution rate    

Multimedia distribution and health risk assessment of typical organic pollutants in a retired industrial

《环境科学与工程前沿(英文)》 2023年 第17卷 第11期 doi: 10.1007/s11783-023-1742-9

摘要:

● A fine portrayal of organic pollutants in a retired industrial park is provided.

关键词: Organic pollutants     Retired industrial park     Spatial correlation     Health risk assessment    

系统工程风险评估方法的研究进展

曹云,徐卫亚

《中国工程科学》 2005年 第7卷 第6期   页码 88-94

摘要:

详细介绍了系统工程风险评估方法及其应用的现状和进展,对各种方法的适用范围及优缺点作了说明,讨论了风险评估方法研究中的几个技术问题,指出目前风险评估方法要解决的问题和今后的研究方向。

关键词: 风险评估     风险分析     系统工程    

Occurrence and health risk assessment of trace heavy metals via groundwater in Shizhuyuan Polymetallic

Bingbing XU,Qiujin XU,Cunzhen LIANG,Li LI,Lijia JIANG

《环境科学与工程前沿(英文)》 2015年 第9卷 第3期   页码 482-493 doi: 10.1007/s11783-014-0675-8

摘要: The Shizhuyuan Polymetallic Mine in Chen-zhou City is an important multi-metal deposit in China. After a dam accident in 1985, there are still a number of mining plants, smelters and tailing ponds in this area. These had the potential to pollute the surrounding groundwater. In this study, groundwater samples were collected from 20 residents’ wells in this area during both dry and wet seasons. In particular, this study focused on the exposure and the health risk assessment of trace heavy metal in groundwater. Multiple statistical analysis and fuzzy comprehensive method were employed to reveal the distribution characteristics of heavy metal and to assess the groundwater quality. Results indicated that Cr, Fe, Ni, Cu, Zn, As, Cd, Ba, Hg and Pb were widespread with low exposure levels. There were 19 wells with low level exposure and one well with a moderate level exposure in the dry season. All of the wells were in low level exposure during the wet season. As and Mn exhibited potential non-carcinogenic concern, because their maximum hazard quotient (HQ) was higher than 1.0. This may cause adverse health effect on adults in dry season or on children in both seasons. Only As, showed that the maximum carcinogenic risk was more than 10 , suggesting a high cancer risk for children in both dry and wet seasons. Therefore, analysis and reduction the concentrations of As and Mn in groundwater are needed in order to protect the health of residents and especially children in the area.

关键词: groundwater     heavy metal     health risk assessment     mine area    

Probabilistic safety assessment of self-centering steel braced frame

Navid RAHGOZAR, Nima RAHGOZAR, Abdolreza S. MOGHADAM

《结构与土木工程前沿(英文)》 2018年 第12卷 第1期   页码 163-182 doi: 10.1007/s11709-017-0384-z

摘要: The main drawback of conventional braced frames is implicitly accepting structural damage under the design earthquake load, which leads to considerable economic losses. Controlled rocking self-centering system as a modern low-damage system is capable of minimizing the drawbacks of conventional braced frames. This paper quantifies main limit states and investigates the seismic performance of self-centering braced frame using a Probabilistic Safety Assessment procedure. Margin of safety, confidence level, and mean annual frequency of the self-centering archetypes for their main limit states, including PT yield, fuse fracture, and global collapse, are established and are compared with their acceptance criteria. Considering incorporating aleatory and epistemic uncertainties, the efficiency of the system is examined. Results of the investigation indicate that the design of low- and mid-rise self-centering archetypes could provide the adequate margin of safety against exceeding the undesirable limit-states.

关键词: self-centering steel braced frame     mean annual frequency     safety assessment     confidence level     margin of safety    

过程操作性能的在线评估与诊断

Sedghi Shabnam,Huang Biao

《工程(英文)》 2017年 第3卷 第2期   页码 214-219 doi: 10.1016/J.ENG.2017.02.004

摘要: 此外,稳态模态的多模态特性由混合概率主成分回归方法(mixture probabilistic principal component regression,MPPCR) 处理;动态主成分回归方法(dynamic

关键词: 最优性能评估     概率主成分回归     多模态过程    

Integrated risk assessment framework for transformation products of emerging contaminants: what we know

《环境科学与工程前沿(英文)》 2023年 第17卷 第7期 doi: 10.1007/s11783-023-1691-3

摘要:

● A better risk assessment can combine the improved non-target analysis method.

关键词: Risk assessment frameworks     Transformation products     Emerging contaminants     High-throughput toxicity screening     Water treatment    

Aerosol exposure assessment during reclaimed water utilization in China and risk evaluation in case of

《环境科学与工程前沿(英文)》 2022年 第16卷 第7期 doi: 10.1007/s11783-021-1516-1

摘要:

• The Chinese population exposure habits were surveyed.

关键词: Legionella     QMRA     Reclaimed water     Aerosol     Water reuse    

渤海湾海底隧道运营风险评估分析

王永红,刘兵,张永刚

《中国工程科学》 2013年 第15卷 第12期   页码 107-112

摘要:

特长海底隧道运营是一个极其复杂的系统工程,存在较大的不确定性和安全风险。根据隧道工程运营期风险评估的一般流程,对渤海湾海底隧道工程在其运营期的风险进行了评估。评估中考虑的主要风险因素有水害、衬砌裂损、冻害、衬砌腐蚀、震害、洞内空气污染、火灾和列车脱轨事故8 种类型。综合运用信心指数法和层次分析法,参照隧道与地下工程风险接受准则和风险等级标准,对渤海湾海底隧道运营期间的风险进行估计与评价。给出了该海底隧道运营期的风险等级,并讨论了本评估工作中尚存在的一些问题和今后有待深入的工作。

关键词: 海底隧道     运营期     风险分析     风险评估    

地下工程风险评估准则分析与研究

姚宣德,王梦恕

《中国工程科学》 2009年 第11卷 第7期   页码 86-91

摘要:

结合地下工程的特点,建设性地提出了地下工程风险评估准则,其成果成功地应用于北京市城市地下道路系统规划设计的研究中。

关键词: 地下工程     风险评估     准则    

标题 作者 时间 类型 操作

Application of probabilistic risk assessment at a coking plant site contaminated by Polycyclic Aromatic

XIA Tianxiang,JIANG Lin,JIA Xiaoyang,ZHONG Maosheng,LIANG Jing

期刊论文

Risk-based probabilistic thermal-stress analysis of concrete arch dams

Narjes SOLTANI, Mohammad ALEMBAGHERI, Mohammad Houshmand KHANEGHAHI

期刊论文

Proposal of a probabilistic assessment of structural collapse concomitantly subject to earthquake and

Gholamreza ABDOLLAHZADEH, Hadi FAGHIHMALEKI

期刊论文

Fate and risk assessment of emerging contaminants in reclaimed water production processes

期刊论文

Human health ambient water quality criteria for 13 heavy metals and health risk assessment in Taihu Lake

期刊论文

Distribution, enrichment mechanism and risk assessment for fluoride in groundwater: a case study of Mihe-Weihe

期刊论文

Multimedia distribution and health risk assessment of typical organic pollutants in a retired industrial

期刊论文

系统工程风险评估方法的研究进展

曹云,徐卫亚

期刊论文

Occurrence and health risk assessment of trace heavy metals via groundwater in Shizhuyuan Polymetallic

Bingbing XU,Qiujin XU,Cunzhen LIANG,Li LI,Lijia JIANG

期刊论文

Probabilistic safety assessment of self-centering steel braced frame

Navid RAHGOZAR, Nima RAHGOZAR, Abdolreza S. MOGHADAM

期刊论文

过程操作性能的在线评估与诊断

Sedghi Shabnam,Huang Biao

期刊论文

Integrated risk assessment framework for transformation products of emerging contaminants: what we know

期刊论文

Aerosol exposure assessment during reclaimed water utilization in China and risk evaluation in case of

期刊论文

渤海湾海底隧道运营风险评估分析

王永红,刘兵,张永刚

期刊论文

地下工程风险评估准则分析与研究

姚宣德,王梦恕

期刊论文